blue-print

Our Work

VISTAKON RESEARCH LABORATORY

VISTAKON RESEARCH LABORATORY

JACKSONVILLE, FLORIDA
This project involved attaching site-cast Tilt-Up concrete panels to a structural steel frame. Tilt-Up was selected because of its ability to meet the tight schedule and cost constraints. Also, Tilt-Up offered the same architectural appeal as the precast design.

Read More on this Project


MILITARY TRAIL PARKING GARAGE

MILITARY TRAIL PARKING GARAGE

BOCA RATON, FLORIDA
This project involved design and construction of a four story parking garage constructed using tilt-up concrete bearing walls, precast concrete columns, precast-prestressed floor beams and cast in place supported concrete floor slabs.

Read More on this Project


MIA SHOES, INC.

MIA SHOES, INC.

MIAMI, FLORIDA
The building consists of load-bearing panels that support the precast concrete second floor and roof framing system. Precast double tees and beams are supported on continuous concrete haunches cast monolithically with the panels.

Read More on this Project


EMBRY-RIDDLE  AERONAUTICAL UNIVERSITY COLLEGE OF BUSINESS

EMBRY-RIDDLE AERONAUTICAL UNIVERSITY COLLEGE OF BUSINESS

DAYTONA BEACH, FLORIDA
This project included the use of interior structural steel framing along with load bearing exterior masonry walls to support the second floor and roof framing systems. The exterior utilized a combination of brick and Alucobond cladding to match the architectural theme throughout the campus.

Read More on this Project


CORNERSTONE II PLANTATION

CORNERSTONE II PLANTATION

FLORIDA
The owner selected Tilt-Up because of its load-bearing capabilities, hurricane-resistance and architectural appeal.

Read More on this Project


BLUE CROSS AND BLUE SHIELD OF FLORIDA

BLUE CROSS AND BLUE SHIELD OF FLORIDA

MIAMI, FLORIDA
Interior load-bearing steel frame and exterior load-bearing Tilt-Up concrete panels.

Read More on this Project


St. JOHNS COUNTY AIR TRAFFIC CONTROL TOWER

St. JOHNS COUNTY AIR TRAFFIC CONTROL TOWER

ST. AUGUSTINE, FLORIDA
The walls were divided vertically into 25-foot-by-20-foot wide panels. In addition, interior floor slabs were constructed on site and then installed during construction

Read More on this Project

Gallery

IN-AxcessMedical-Center-SarasotaFlorida
IN-DeerfieldBeachMOC-Deerfield-BeachFlorida
IN-Embry-RiddleAeronauticalUniversity
IN-VistakonJacksonvilleFlorida
MAN-FirstSolarPerrysburgOhio
MAN-JACToledoOhio
MAN-KalidaOhio
MAN-NorlakeNorthRidgevilleOhio
OFFICE-BlueCrossBlueShieldMiamiFlorida
OFFICE-Cornerstone2PlantationFlorida
OFFICE-Doral4StoryOffice-uildingMiamiFlorida
OFFICE-Tower2OfficeBuildingIndianapolisIndiana
PARK-Midtown2StoryParkingGaragePalmBeachGardensFlorida
PARK-MilitaryTrail4StoryParkingGarageBocaRatonFlorida
PARK-MilitaryTrail4StoryParkingGarageFtLauderdaleFlorida
Retail-BigKmartMayaguezPuertoRico
Retail-PlazaCentroCaguasPuertoRico
Retail-PoncePuertoRico
Retail-TheHarborShopsFtLauderdaleFlorida
SPEC-CantileveredRetailSignStructureCaguasPuertoRico
SPEC-MontanaVacationHome
SPEC-StJohnsAirportControlTowerStAugustineFlorida
SPEC-WoodenCoveredBridgeRenovationGreeneCountyOhio
WH-LibertyGloucesterCountyNewJersey
WH-Med-Pass-SpringboroOhio
WH-MiaShoesMiamiFlorida
WH-UPS-SortingFacilityMaumeeOhio

assoc-logos